The American Five Year Plan, 2028–2032

A national plan written by civilians. 27 indicators, each with a baseline from a public agency, a 2032 target anchored to a rate somebody has already reached, a value for every year from 2028 to 2032, and, where the outcome is a public body’s to deliver, the name of that body. Scored every July 4.

11 binding · 13 anticipatory · 3 guard · mid-term evaluation 2030

#IndicatorBaseline2032 targetTypeBody scored
Prosperity and solvency
1Real median household income$87,460$100,000Anticipatory—
2Federal deficit, share of GDP5.9% (FY2025)3.0% or less (FY2032)BindingCongress and the President
3Debt held by the public, share of GDP99.5% (FY2025)Below 106.1% in every yearBindingCongress and the President
4Social Security and Medicare hospital insurance solvencyDepletion projected Q4 2032 and Q2 2033Law restoring 75-year balance signed by end of 2030BindingCongress
EnergyRow 6 is the AI Transition Tracker's energy number carried into the plan: the firm capacity the J-Curve model says must be built, cut at 2032.
5Utility-scale generating capacity added per year53 GW (2025)100 GW a year from 2030 onwardAnticipatory—
6New firm generating capacity added to the grid since 2024, cumulativeAbout 2 GW in 2025 (18 TWh/yr of new firm-equivalent supply)170 GW by 2032, on the path to 243 by 2035Anticipatory—
7Median years from interconnection request to operationOver 4 (plants built 2018–2024)Under 2BindingFERC and the grid operators
8Transmission energized per year, 100 kV and above3,300 (2011–2020 average)4,100Anticipatory—
9Median years to complete an environmental impact statement2.2 (2024)1.5, with none over 2BindingFederal lead agencies and CEQ
10Average retail electricity price, all sectors, real12.94 ¢/kWh (2024)No higher than 2024 in real termsGuard—
11Large power transformer lead time36–60 months (2024)Under 12 monthsAnticipatory—
The rebuildThe Moses-Jacobs Act is this chapter's vehicle. The plan's window is the Act's first five years, and this scorecard is the midpoint test the Act requires and never defines.
12Housing starts per year1.36 million (2025)2.0 million a year from 2030 onwardAnticipatory—
13Share of ASCE's ten-year infrastructure need that is funded59% ($5.4 of $9.1 trillion)100%Anticipatory—
14Federal outlays under the rebuild law, cumulative$0 (no law)$637 billion by end of FY2032BindingCongress and the Mission Board
15Tier 0 micro-projects completed under the Fast Lane, cumulative0250,000BindingThe Regional Delivery Authorities
16Lead service lines replaced0 of 4.0 million2.4 millionBindingEPA and the water systems
17Share of rebuild dollars published within 72 hours of the transaction0% (USAspending reports monthly; 0–1% of records fully consistent)100%, in every yearBindingThe Mission Board
18Ledger-verified fraud loss, share of rebuild outlaysRecovery Act: 144 convictions, about $1.9 million of $800 billionUnder 0.5% in every yearGuard—
19Construction producer prices, trailing twelve months+5.2% (year to July 2026); +30.3% over 2020–2024Under 6% in any two consecutive quartersGuard—
The frontier
20Federal R&D outlays, share of GDP0.6% (FY2025)1.2%BindingCongress
21Total R&D, share of GDP3.4% (2024)4.5%Anticipatory—
22Manufacturing labor productivity growth per year−0.16% a year (2010–2025)3.0% a yearAnticipatory—
23Commercial ships built in US yards per yearFewer than 535Anticipatory—
24Critical minerals that depend on a non-allied country for most of their supply8 with China as primary source; 33 over 50% import-reliant (2025)0Anticipatory—
The people
25Life expectancy at birth79.0 (2024)80.6Anticipatory—
26Child poverty, Supplemental Poverty Measure13.4% (2024)5.2% or lessBindingCongress
27Fourth-graders at or above NAEP Proficient in reading31% (2024)40%, passing 35% by 2030Anticipatory—

Hover a column heading for what it means. Open a row for what it measures, why it is in the plan, and its path year by year. Scoring begins with the first July 4 scorecard after adoption; until then the table is a proposal. The energy rows are already tracked on the AI Transition Tracker.

Rows waiting for an anchor

A row with no demonstrated rate, statute or official estimate stays out of Table 1 until it has one.

IndicatorBaselineWhat it needsChapter
Projects completed against the needs matrix, Ledger-verified0 of about 900,000 projects in the Act's 816-row matrix ($9.8 trillion)the Mission Ledger's public feed (Act Sec. 301); until it exists there is no source of record, and outlays (row 14) stand inrebuild
States signed to Mission Compacts0; the Act's roadmap expects forty-plus governors within three yearsthe Mission Board's published compact register (Act Sec. 106); the anchor exists: 41 states including DC adopted Medicaid expansionrebuild
Registered apprentices in the building trades660,000 active (GAO-25-107040); the Act's Academy Network sizes cohorts annuallya current DOL baseline reconciled with GAO's figure, and the German or Swiss share of the youth cohort as the anchorrebuild
Programmatic Master Reviews completed0; the Act requires one per mission category within 18 months of the Board's first meetingthe Board to exist; then CEQ's programmatic review registerrebuild
Bridges in poor condition41,685, 6.7% of the inventory (2025)the fastest state rate of clearing poor bridges, 2015–2025, from the National Bridge Inventory by ownerrebuild
Nuclear capacity under construction97 GW operating, 94 reactorsreactors brought online per year in the 1970s–80s (NRC Information Digest) or France's Messmer rateenergy
Data-center load energized per year176 TWh used in 2023; 325–580 TWh projected by 2028 (LBNL)an anchor for a supply-matched pace; the tracker's compute row is the working versionenergy
Prime-age labor force participation83.4% (August 2026)the record high from the BLS historical seriespeople
Navy battle force ships delivered on scheduleall 37 ships GAO analysed were behind schedulea demonstrated on-time rate; contract and projected delivery dates per hullfrontier
Improper payments$186 billion (FY2025)a peer or historical rate; Treasury Office of Payment Integrity resultssolvency
Transit cost per kilometerUS sixth most expensive; global average near $252 million/kmthe Transit Costs Project country table with the US rowrebuild
National service positionsAmeriCorps and Peace Corps annual countsa CCC-era or peer-country ratepeople
Value per kWh of AI compute (AIROI)about $0.50 per kWh (2025), the J-Curve paper's estimatea measured series; the tracker carries it as an estimate-flagged rowfrontier

Rules that protect the numbers

Path
Every row carries one value per plan year. Unless a row says otherwise the path is linear from the baseline year to 2032; rows that step (5, 10) or follow an exam calendar (20) or a statute clock (4, 12) say so in path_note.
Anchor
demonstrated = a pace the US, a state or a peer country has reached; statute = a deadline or standard in federal law; estimate = a need quantified by a public or professional body; act = a provision of the Moses-Jacobs Act, the plan's legislative vehicle for the rebuild, with the public source behind it; model = a requirement computed by the plan's own open model from public inputs (the J-Curve white paper and its project ledger), with the code and the inputs published; guard = a row that protects another row. No target without an anchor.
Binding
an outcome a named public body holds the legal authority to deliver; the body is scored every year.
Anticipatory
an outcome firms, households, builders and scientists deliver once public bodies have made the decisions that are theirs; tracked, with the public decisions that delay it reported.
Guard
a row that fails the plan if another row is met at its expense.
Vehicle
The Moses-Jacobs Act (a white paper in ten chapters and a draft statute, local at ~/Work/personal/moses-jacobs-act/) is the legislative vehicle for the rebuild chapter. Its ten-year window is FY2028–2037; the plan's window is its first five years. Sec. 404(d) of the Act requires a midpoint report at the end of FY2032 stating Ledger-verified real output against plan, and its first hundred days publish the scorecard format before the first dollar moves. This table is that plan and that scorecard. Rows 13 through 19 are the Act's; rows 9, 11, 12 and 24 name its mechanisms.
Data
The plan’s authors never produce the plan’s data. Every row is measured by the agency named on it.
Change
Rows change only at the mid-term with a two-thirds vote of the convention, and every change is logged with its reason.

Draft lineage: vault: Projects/personal/seriousness/The American Seven Year Plan — First Draft.md (2026-09-19), re-anchored to 2032.

Pick a fight with a row

Tell us which anchor is wrong, which body is misnamed, which target is too timid. The convention that adopts this table needs several hundred people who each know one industry better than its authors know any of them. Applications for the drafting workshops, one per chapter, open with the essay.